Specialist Experience in Oil, Gas and Measurement Projects

Sanat Khat va Palayesh began operations in 2000 and developed its delivery experience across EPC projects, export-gas stations and measurement systems.

01 / Overview

Company

Project delivery with a focus on technical accuracy.

SKP is an EPC contractor for oil and gas projects, providing engineering, procurement, construction, installation, testing and commissioning. Metering and process measurement are central to the company's documented experience.

The delivery approach is based on clear scope definition, interface management, document control and performance verification before handover.

SKP's Managing Director is Dr. Siavash Gohardehi. Babak Sultan Es-hagh is Chairman of the Board and Houshang Dastgiri is Vice Chairman.

Bazargan station project

Delivery approach

Engineering decisions consider execution safety, testability and operational requirements.
02 / History

Milestones

How the experience developed.

2000–2005

Founding and Company Name

The company began in 1379 (2000) as Behsazan Khotoot Loole Kouhestan, founded by managers who had previously delivered major oil and gas projects at Tehran Pipeline Company. Its first work was the mechanical and instrumentation scope of phases 2 and 3 of the Bazargan gas metering station. The name Sanat Khat va Palayesh was registered in 1384 (2005).

2007

Armenia Export Gas Station

EPC delivery of the Iran–Armenia export gas metering station, with three parallel runs and a capacity of 10 MSCMD. The station was officially inaugurated on 27 Esfand 1385 (March 2007).

2012

Iran–Iraq Export Project

The EPC contract for the Naftshahr gas quantity-and-quality metering station was awarded, initially rated at 25 MSCMD and later raised to 40 MSCMD.

2016

48-inch Receiver Station

Construction of the Naftshahr branch pig receiver station on the 48-inch line, with final handover on 30 January 2016 (10 Bahman 1394).

2019

Naftshahr Handover

Final handover of the Naftshahr export gas metering station on the Iran–Iraq border (EPC, quantity and quality metering, 40 MSCMD) on 10 April 2019 (21 Farvardin 1398). Work had started on 23 September 2013 (1 Mehr 1392).

2024

Modernization and Specialist Repair

Metering-system standardization at Marjan Petrochemical and the repair and recommissioning of the Fifth South Pars refinery butane tank were both awarded in the same year.

2025

Shazand Handover and Refinery Programme

The Shazand oil metering, proving and automatic sampling systems project (PC contract) was completed and handed over. In December 2025 (20 Azar 1404), supply, integration, testing, installation and commissioning contracts for metering and analyzer systems at the Ilam, Parsian, Shahid Hasheminejad and South Pars No. 10 gas refineries were awarded to SKP through the Tarh va Bazresi / Ghods Niroo partnership, under the IGEDC programme.

2026

Jam Ethane Metering and Sari Completion

The EPC project for the Jam Petrochemical custody-transfer ethane feed-gas metering system is in progress. The Sari clamp-on ultrasonic gas metering project (supply, installation and commissioning) was completed.

03 / MeTAS Partnership

Partnership with MeTAS

Sanat Khat va Palayesh (SKP) is in partnership with MeTAS and acts as MeTAS's representative in Iran.

The SKP and MeTAS partnership

Technical organization

Disciplines required for integrated project delivery.

Leadership

Board and Senior Management

Dr. Siavash Gohardehi

Role
Managing Director
Board Member
Degree and field
PhD, Mechanical Engineering

Babak Sultan Es-hagh

Role
Chairman of the Board
Degree and field
MSc, Mechanical Engineering

Houshang Dastgiri

Role
Vice Chairman of the Board
Degree and field
MSc, Mechanical Engineering
Relevant experience
Previously led Tehran Pipeline Company

Shahriar Dianat

Role
Board Member
Degree and field
MSc, Mechanical Engineering