EPC contractor and metering systems specialistinfo@skpalayesh.ir+98 21 8770 0043
Technician inspecting metering-system control equipment

EPC Services

The Complete EPC Delivery Cycle

A coordinated delivery path from studies and design through procurement, construction, installation, testing and commissioning. SKP has delivered the Iran–Turkey, Iran–Armenia and Iran–Iraq export gas metering stations, the 48-inch receiver station at Naftshahr and the Marjan Petrochemical gas-metering upgrade as EPC contractor, and is executing the Jam Petrochemical ethane metering project under an EPC contract.

EPC record

5 handed over, 1 in progress
6 EPC contracts
Recorded capacity of the Naftshahr export gas station on the Iran–Iraq border, handed over in 2019
40 million standard m³/day
Recorded main-station capacity at Norduz, on the Iran–Armenia border
10 million standard m³/day
Length of the Norduz EPC contract; the station was inaugurated on 18 March 2007
12 months
01

Engineering

Developing the solution from feasibility through construction-ready deliverables.

  • Technical-economic and feasibility studies
  • Conceptual, basic and detailed engineering
  • Tender documentation and bid evaluation
  • Site engineering and as-built documentation
  • 3D modelling and client model reviews before fabrication

Project examples: Naftshahr Export Gas Station, Norduz Export Gas Station

02

Procurement

Technical and commercial management of project equipment and materials.

  • Procurement engineering and specifications
  • Supplier evaluation and selection
  • Purchase and manufacturing inspection
  • Expediting, logistics and delivery

Project examples: Naftshahr Export Gas Station, Sari Ultrasonic Flowmeter Project

03

Construction & Installation

Coordinated workshop fabrication and site execution.

  • Skid fabrication and integration
  • Piping, mechanical, electrical and instrumentation
  • Civil, structural and access works
  • Construction supervision and site management
  • Modifications to existing metering streams and live lines

Project examples: 48-inch Receiver Station, Norduz Export Gas Station, Marjan Metering Modernization

04

Testing & Commissioning

Demonstrating system performance before operational handover.

  • Factory acceptance testing
  • Pre-commissioning and site testing
  • Calibration and system configuration
  • Commissioning, training and documentation

Project examples: Shazand Project, Naftshahr Export Gas Station

EPC contracts

SKP's scope on each EPC contract.

ProjectPeriodEngineeringProcurementConstruction & InstallationTesting & CommissioningStatus
Naftshahr Export Gas Station2013–2019In SKP's scopeIn SKP's scopeIn SKP's scopeIn SKP's scopeCompleted
Norduz Export Gas Station2007In SKP's scopeIn SKP's scopeIn SKP's scopeNot listed in SKP's scope in the project recordCompleted
Marjan Metering Modernization2024–2025In SKP's scopeIn SKP's scopeIn SKP's scopeNot listed in SKP's scope in the project recordCompleted
Bazargan Export Gas Station2000–2001Not listed in SKP's scope in the project recordNot listed in SKP's scope in the project recordIn SKP's scopeIn SKP's scopeCompleted
48-inch Receiver Station2014–2016Not listed in SKP's scope in the project recordNot listed in SKP's scope in the project recordIn SKP's scopeIn SKP's scopeCompleted
Jam Metering Project2026In SKP's scopeIn SKP's scopeIn SKP's scopeIn SKP's scopeIn progress

A tick means the published project record lists that stage in SKP's scope. A dash means the stage is not in that list.

EPC contract in progress

Jam Petrochemical ethane metering, from design model to custody-transfer certificate.

SKP holds the EPC contract for the custody-transfer ethane feed-gas metering system at Jam Petrochemical in Assaluyeh, and the work is in progress. The stages below are the contract scope. The model is built from SKP's detailed design and is not a photograph of the site.

Jam project record

Contract stages

  1. Basic and detailed engineering of the metering system across process, piping, instrumentation and control, electrical and civil
  2. PDMS 3D model and a formal model review with the client before fabrication
  3. Procurement of equipment and materials, skid fabrication and control-panel fabrication
  4. Inspection, factory acceptance testing (FAT) and transport of the skid to Assaluyeh
  5. Foundation and platform construction, and cutting and branching of the existing 12-inch ethane line
  6. Skid and control-panel installation, site acceptance testing (SAT) and pre-commissioning
  7. Commissioning, performance testing, operator training and custody-transfer certification
Interactive 3D model of an ethane metering station on a raised steel platform

Drag to orbit, scroll or pinch to zoom.

Simplified for the web from SKP's detailed-design model. Arrangement and proportions only; no drawing, tag or process data is reproduced.

Engineering disciplines

Coordinating disciplines within one delivery model.

06 / Process

Delivery model

Main stages of project delivery.

01

Define

Agreed design basis, scope split and acceptance criteria, signed off with the employer at kick-off.

02

Engineer

Construction-issue drawings and datasheets, and a 3D model the employer has reviewed before anything is fabricated.

03

Deliver

Equipment that has passed inspection and FAT, installed and tied in on site, including connections to lines in service.

04

Verify

A commissioned system with its test records, trained operators, certification where the contract requires it, and the as-built dossier.

Have an EPC package out to tender?

Send us the tender documents or the RFQ. We will reply with how we would split the scope and run the work.

Contact SKP