EPC contractor and metering systems specialistinfo@skpalayesh.ir+98 21 8770 0043
Bazargan export gas metering station

Engineering, procurement, construction and commissioning

EPC contractor for oil, gas and petrochemical facilities

Since 2000, SKP has built export gas metering stations on Iran’s borders with Turkey, Armenia and Iraq as EPC contractor. Today it is delivering EPC projects for petrochemical plants and metering and analyzer systems for gas refineries.

SKP

Since 2000

01 / Company

Integrated services

From border export stations to refinery metering packages.

Sanat Khat va Palayesh has worked on oil and gas projects since 2000. Its documented experience spans export-gas stations, metering systems, pipeline facilities and process equipment.

About SKP
02 / EPC

Core capabilities

One delivery chain, from engineering to handover.

5 handed over, 1 in progress
6 EPC contracts
Recorded capacity of the Naftshahr export gas station on the Iran–Iraq border, handed over in 2019
40 million standard m³/day
Recorded main-station capacity at Norduz, on the Iran–Armenia border
10 million standard m³/day
Length of the Norduz EPC contract; the station was inaugurated on 18 March 2007
12 months
Explore Our Capabilities
03 / Projects

Selected experience

Selected SKP project experience.

Metering streams at the Norduz export gas station on the Iran–Armenia border, September 2009
EPC2007

Norduz Export Gas Station

EPC delivery of an export-gas metering station near the Aras River, including the main station and a temporary metering facility.

Read More
Render of SKP's detailed design for the Jam Petrochemical ethane metering station, seen from the south-east; not a site photograph
EPC2026

Jam Metering Project

The project covers the implementation of a custody transfer Ethane Feed Gas Metering System for Jam Petrochemical Company, including engineering, procurement, installation, testing, commissioning, certification, and final handover in accordance with applicable standards.

Read More
View projects
04 / Metering

Process specialization

Accurate measurement, from design through integration.

All measurement systems

Clients

Organisations SKP has worked for, directly or through a main contractor.

05 / History

Development path

A summary of the company’s history.

2019

Naftshahr Handover

Final handover of the Naftshahr export gas metering station on the Iran–Iraq border (EPC, quantity and quality metering, 40 MSCMD) on 10 April 2019 (21 Farvardin 1398). Work had started on 23 September 2013 (1 Mehr 1392).

2024

Modernization and Specialist Repair

Metering-system standardization at Marjan Petrochemical and the repair and recommissioning of the Fifth South Pars refinery butane tank were both awarded in the same year.

2025

Shazand Handover and Refinery Programme

The Shazand oil metering, proving and automatic sampling systems project (PC contract) was completed and handed over. In December 2025 (20 Azar 1404), supply, integration, testing, installation and commissioning contracts for metering and analyzer systems at the Ilam, Parsian, Shahid Hasheminejad and South Pars No. 10 gas refineries were awarded to SKP through the Tarh va Bazresi / Ghods Niroo partnership, under the IGEDC programme.

2026

Jam Ethane Metering and Sari Completion

The EPC project for the Jam Petrochemical custody-transfer ethane feed-gas metering system is in progress. The Sari clamp-on ultrasonic gas metering project (supply, installation and commissioning) was completed.

Full history
The Bazargan gas metering station during installation and integration

Quality & HSE

Quality control across the project lifecycle.

Inspection, testing, documentation and risk-management requirements are defined early and monitored throughout delivery.

Quality and HSE approach