EPC contractor and metering systems specialistinfo@skpalayesh.ir
Jam Petrochemical Complex

Project case study

Jam Petrochemical Complex Ethane Gas Metering Project

The project covers the implementation of a custody transfer Ethane Feed Gas Metering System for Jam Petrochemical Company, including engineering, procurement, installation, testing, commissioning, certification, and final handover in accordance with applicable standards.

ClientJam Petrochemical Complex
Consultant-
LocationAsalouyeh - Bushehr
ContractEPC
Recorded period9 Months

Scope of work

Principal project responsibilities

Selected technical data

Documented project information

Measurement technology
Coriolis mass flow meters (Emerson)
Stream arrangement
3 × 100% — duty, stand-by and master (N+1+1)
Proving method
Master-meter stream in Z-configuration
Design standards
AGA Report 11, OIML R137-1 and IPS
Accuracy
Maximum permissible error ±0.5% on the duty meters and ±0.25% on the master meter
System uncertainty
Better than ±0.7%
Calibration
At ISO 17025-accredited centres, attended by the client's representative
Process connection
12-inch 300# inlet header with 10-inch meter runs
Area classification
Hazardous area
Control system
Flow computers, functional logic, control architecture and HMI graphics
Testing
FAT, SAT, pressure testing, radiography, PT, full I/O check and performance test
Certification
Custody-transfer certification with the regulatory authority, and handover to the client

Project records are compiled from SKP's own contract and engineering documentation. Current status and time-sensitive details are shown only where they have been formally confirmed.